Erfolg
IT-Phase
Build, Test, SBOM, Image-Signatur
- Checkout9 s
- Lint & Static Analysis21 s
- Build & Unit Test1 min 36 s
- SBOM (CycloneDX+SPDX)18 s
- Container Sign & Push14 s
OT-Phase
OPC-UA Pre-Check, Wartungsfenster, Blue-Green-Cut-Over
- OPC-UA Pre-Check4 s
- Maintenance Window Gate2 s
- Blue-Green Deploy4 min
- Smoke Test on Cell1 min 28 s
- Production Cut-Over12 s
Deployment-Matrix
| Maschine | Halle | Status | Slot | Version | Fortschritt |
|---|---|---|---|---|---|
| PLC-7PLC | Werk Sindelfingen / Halle 2 | Aktualisiert | green | 2.14.0 | – |
| PLC-8PLC | Werk Sindelfingen / Halle 2 | Aktualisiert | green | 2.14.0 | – |
OPC-UA Pre-Check Log
[2026-05-06T00:37:57.491Z] opcua-bridge: connecting to ot-proxy-agent (mTLS) [2026-05-06T00:37:57.491Z] opcua-bridge: subscribed nodes for pipeline plc-logic-deploy [2026-05-06T00:37:57.491Z] check ns=2;s=Channel1.Device1.MachineState value=idle expected=idle OK [2026-05-06T00:37:57.491Z] check ns=2;s=Channel1.Device1.SpindleRpm value=0 expected=0 OK [2026-05-06T00:37:57.491Z] check ns=2;s=Channel1.Device1.SafetyDoor value=closed expected=closed OK [2026-05-06T00:37:57.491Z] check ns=2;s=Channel1.Device1.JobActive value=false expected=false OK [2026-05-06T00:37:57.491Z] opcua-bridge: production_lock evaluated -> safe [2026-05-06T00:37:57.491Z] opcua-bridge: maintenance_window in 11h 04m [2026-05-06T00:37:57.491Z] opcua-bridge: ready for blue-green deploy