Läuft
IT-Phase
Build, Test, SBOM, Image-Signatur
- Checkout12 s
- Lint & Static Analysis41 s
- Build & Unit Test3 min 4 s
- SBOM (CycloneDX+SPDX)22 s
- Container Sign & Push18 s
OT-Phase
OPC-UA Pre-Check, Wartungsfenster, Blue-Green-Cut-Over
- OPC-UA Pre-Check3 s
- Maintenance Window Gate1 s
- Blue-Green Deploy–
- Smoke Test on Cellwartet
- Production Cut-Overwartet
Deployment-Matrix
| Maschine | Halle | Status | Slot | Version | Fortschritt |
|---|---|---|---|---|---|
| CNC-01CNC | Werk Sindelfingen / Halle 4 | Aktualisiert | green | 4.7.1 | – |
| CNC-02CNC | Werk Sindelfingen / Halle 4 | Update läuft | blue | 4.6.9 → 4.7.1 | 62% |
| CNC-03CNC | Werk Sindelfingen / Halle 4 | Ausstehend | – | 4.6.9 → 4.7.1 | – |
| CNC-04CNC | Werk Sindelfingen / Halle 5 | Ausstehend | – | 4.6.9 → 4.7.1 | – |
OPC-UA Pre-Check Log
[2026-05-06T00:39:35.349Z] opcua-bridge: connecting to ot-proxy-agent (mTLS) [2026-05-06T00:39:35.349Z] opcua-bridge: subscribed nodes for pipeline firmware-cnc-mills [2026-05-06T00:39:35.349Z] check ns=2;s=Channel1.Device1.MachineState value=idle expected=idle OK [2026-05-06T00:39:35.349Z] check ns=2;s=Channel1.Device1.SpindleRpm value=0 expected=0 OK [2026-05-06T00:39:35.349Z] check ns=2;s=Channel1.Device1.SafetyDoor value=closed expected=closed OK [2026-05-06T00:39:35.349Z] check ns=2;s=Channel1.Device1.JobActive value=false expected=false OK [2026-05-06T00:39:35.349Z] opcua-bridge: production_lock evaluated -> safe [2026-05-06T00:39:35.349Z] opcua-bridge: maintenance_window in 11h 04m [2026-05-06T00:39:35.349Z] opcua-bridge: ready for blue-green deploy