Produktion gesperrt
IT-Phase
Build, Test, SBOM, Image-Signatur
- Checkout8 s
- Lint & Static Analysis19 s
- Build & Unit Test1 min 18 s
- SBOM (CycloneDX+SPDX)16 s
- Container Sign & Push13 s
OT-Phase
OPC-UA Pre-Check, Wartungsfenster, Blue-Green-Cut-Over
- OPC-UA Pre-Check4 s
- Maintenance Window Gate–
- Blue-Green Deploy–
- Smoke Test on Cell–
- Production Cut-Over–
Deployment-Matrix
| Maschine | Halle | Status | Slot | Version | Fortschritt |
|---|---|---|---|---|---|
| EDGE-01EDGE | Werk Sindelfingen / Halle 4 | Gesperrt | – | 3.0.4 → 3.1.0 | – |
OPC-UA Pre-Check Log
[2026-05-06T00:37:57.707Z] opcua-bridge: connecting to ot-proxy-agent (mTLS) [2026-05-06T00:37:57.707Z] opcua-bridge: subscribed nodes for pipeline edge-gateway [2026-05-06T00:37:57.707Z] check ns=2;s=Channel1.Device1.MachineState value=idle expected=idle OK [2026-05-06T00:37:57.707Z] check ns=2;s=Channel1.Device1.SpindleRpm value=0 expected=0 OK [2026-05-06T00:37:57.707Z] check ns=2;s=Channel1.Device1.SafetyDoor value=closed expected=closed OK [2026-05-06T00:37:57.707Z] check ns=2;s=Channel1.Device1.JobActive value=false expected=false OK [2026-05-06T00:37:57.707Z] opcua-bridge: production_lock evaluated -> safe [2026-05-06T00:37:57.707Z] opcua-bridge: maintenance_window in 11h 04m [2026-05-06T00:37:57.707Z] opcua-bridge: ready for blue-green deploy